Skip to content

Solar Company in Surat for Rooftop, Industrial & Commercial Solar

OM Engineering (SuryaSetu) is a solar EPC company serving Surat from our office in Bardoli, Surat district — close enough for a site visit within a working day, experienced enough to have 80+ MWp of executed projects behind every proposal. From textile mills in Sachin and Pandesara to commercial buildings on the ring road, we design, install and maintain solar plants that are engineered for your site, not copied from a catalogue.

Site visit
Within 24–48 hours
Electricity utilities
Torrent Power · DGVCL
Local reference
160 kWp textile mill
Segments
Textile · Industrial · Commercial

Built for Surat's textile and industrial load profiles

Surat's textile mills, dyeing and printing units, embroidery clusters and engineering works run heavy daytime loads — exactly the consumption pattern solar serves best. A correctly sized rooftop system on a Sachin or Pandesara shed typically offsets a large share of daytime units at a fraction of the grid tariff, with payback in three to five years.

We have already delivered for Surat's flagship industry: a 160 kWp rooftop plant at Agrawal Textile Mill in Surat, installed over live operations with safe access provisions and clean cable routing. The same engineering discipline — shadow analysis, wind-rated structures, documented testing — goes into every project, from 25 kW commercial roofs to multi-shed industrial arrays.

Net metering with Torrent Power and DGVCL, handled for you

Electricity distribution in Surat is split: consumers inside the city licence area are served by Torrent Power, while the district's industrial estates and surrounding talukas fall under DGVCL. The paperwork differs — application routes, feasibility checks, meter replacement and charging permission — and getting it wrong stalls projects for months.

Our regulatory desk manages GEDA registration, DISCOM applications, CEIG approvals and net metering documentation with both utilities as part of the EPC scope, so your plant is not just installed but legally connected and exporting on schedule.

Areas we serve in & around Surat

  • Sachin GIDC
  • Pandesara
  • Udhna
  • Katargam
  • Varachha
  • Kadodara
  • Palsana
  • Hazira
  • Kamrej
  • Surat city

Proof, not promises

Delivered across South Gujarat

All projects
Industrial160 kWp

Rooftop solar plant at Agrawal Textile Mill

Surat, Gujarat

Textile-mill rooftop system in OM Engineering's home district, delivered with safe access provisions and clean cable routing over live operations.

Industrial rooftop · Grid-tied

Commercial485 kW

Rooftop solar PV system at Inorbit Mall

Vadodara, Gujarat

Rooftop solar PV system installed across the mall's roof spaces, offsetting daytime common-area and tenant loads for one of Vadodara's landmark retail destinations.

Commercial rooftop · Grid-tied

Industrial220 kW

Rooftop solar plant at Siddheshwari Paper Mill

Palanpur, Gujarat

Industrial rooftop installation for an energy-intensive paper mill, engineered around the plant's roof structure and daytime process load.

Industrial rooftop · Metal sheet roof

FAQ

Going solar in Surat — common questions

Do you install solar for textile mills in Surat?

Yes — textile is our home industry. We have delivered a 160 kWp rooftop plant for Agrawal Textile Mill in Surat and serve dyeing, printing, weaving and embroidery units across Sachin, Pandesara and Palsana. Metal-shed roofs are engineered with non-damaging, wind-rated mounting.

Which areas of Surat do you cover?

All of Surat city and district — including Sachin GIDC, Pandesara, Udhna, Katargam, Varachha, Kadodara, Palsana, Hazira and Kamrej. Our office in Bardoli (Surat district) puts most sites within an hour's drive, so surveys and service visits are fast.

Who handles net metering — Torrent Power or DGVCL?

Depends on your location: Surat city licence area is served by Torrent Power, while district industrial estates fall under DGVCL. We manage the complete net-metering process with both utilities, along with GEDA and CEIG formalities, as part of our EPC scope.

How quickly can a Surat project start?

We schedule site visits within 24–48 hours of your enquiry. After the free assessment, a techno-commercial proposal follows, and typical contract-to-commissioning time is 3–6 months — with many rooftop installations needing less than 30 days of on-site work.

Start saving from your next bill

Ready to go solar in Surat?

Tell us about your site in Surat — an engineer will call within one working day and schedule a free visit.