Industrial Solar EPC — Solar Power for Factories & Manufacturing Units
For manufacturing units, electricity is a permanent input cost — and a solar plant is the most dependable long-term hedge against rising grid tariffs. OM Engineering designs, procures, constructs and maintains industrial solar plants end to end, on factory rooftops and on ground-mounted sites, with generation protected by disciplined engineering.
- Deployment
- Rooftop & ground-mount
- Delivery cycle
- 3–6 months typical
- Land (ground-mount)
- ~4 acres / MW
- Indicative payback
- 3–5 years
Scope of work
What we deliver
Factory rooftop solar plants
Grid-tied arrays on industrial sheds and RCC roofs — proven across textile mills, paper mills and process plants, installed safely over live operations.
Ground-mounted solar plants
Turnkey ground-mount PV on your own land — civil foundations, structures, electrical works, testing and commissioning under one contract.
Electrical works & plant integration
DC and AC electrical works, DCDB/ACDB and LT/HT panels, cabling, earthing, lightning protection, metering and integration with your plant's systems.
Statutory approvals & liaisoning
GEDA, DISCOM and CEIG coordination — plan approval, charging permission and net metering documentation handled by our regulatory team.
Why manufacturers are switching to solar
Industrial consumers pay among the highest grid tariffs in India, and those tariffs have historically risen faster than inflation. A well-engineered solar plant locks a large share of your daytime consumption at a flat, predictable cost per unit for 25 years — with most industrial systems paying back in three to five years, and businesses additionally claiming accelerated depreciation on the asset.
OM Engineering has delivered for energy-intensive industries including textile mills and paper mills — sectors where daytime process loads line up naturally with solar generation, making self-consumption economics strongest.
Engineered for the actual site, not a catalogue
Every plant is engineered for the site it stands on: roof type and condition, wind loads, corrosion exposure, shadow behaviour, cable routing, maintenance access and interconnection requirements. Rigorous shadow analysis optimises the layout for year-round output, and structures are designed to the roof interface and wind-load basis — with civil pedestals in M20/M25 grade concrete where applicable, verified for compression strength.
Quality is enforced through the build: incoming material inspection against approved specifications, torque checks and fastener verification, string polarity, insulation resistance and open-circuit voltage tests, and earth resistance and protection checks — closed out with a commissioning checklist and documented handover.
One accountable partner, from site visit to O&M
Industrial solar projects fail on coordination, not technology. Our in-house engineering, procurement, project management and O&M teams collaborate on every project, and our regulatory desk manages GEDA, DISCOM and CEIG processes in parallel with construction. The result is a typical contract-to-commissioning cycle of 3–6 months — and a single phone number for everything, for the life of the plant.
FAQ
Industrial Solar EPC — common questions
Can solar be installed without stopping production?
Yes. Our teams plan material movement, structure erection and cabling around your operating hours under permit-to-work controls, with the only planned outage being a brief, pre-agreed shutdown for final grid tie-in. Our track record stands at 100% accident-free man-hours.
Rooftop or ground-mounted — which suits our factory?
If you have sound shed or RCC roof area, rooftop is usually the fastest and most economical start. Ground-mount suits units with spare land or loads beyond what the roof can host — plan for roughly 4 acres per MW. We assess both during the free site visit.
How long does an industrial solar project take?
Typical contract-to-commissioning is 3–6 months including approvals, engineering, procurement and construction — with many rooftop sites needing less than 30 days of actual installation work.
Do you handle GEDA, DISCOM and CEIG approvals?
Yes — government liaisoning is a core service. We manage GEDA registration, DISCOM coordination, CEIG plan approval and inspection, charging permission and net metering documentation end to end.